The following is my current and constantly changing list of winter maintenance tasks as of 23 Nov 2008.
Winterizing & Storage
- Finish boat shed (Completed, 21 Sep 08, 16 Oct 08, 17 Oct 08, 1 Nov 08, 9 Nov 08)
- Remove everything from Bolero and fresh water wash (Completed, 10 Nov 08)
- Wash sails, lines, mast & boom and anchor rode (Completed)
- Build scaffolding (On hold until next year)
- Setup boat shed storage & work area (lights, bench, shelves etc) (Completed)
- Install track for reefing cars (Working on final layout)
- Find suitable reef hooks and install (Potential parts on order)
- Install reefing winch & rope clutch on boom (Working on final layout and mounting base)
- Install reef ties on mainsail (Wait til mast is up)
- Replace one of the mainsheet blocks to relieve binding (Completed)
- Re-rig backstay to mast attachment (Parts on order)
- Replace clevis pin cotter pins with rings (Parts on order)
- Assembly rigging spare parts
- Get Velcro for turnbuckles & jib
- Whip all line ends (In work)
- Create & install boom vang and boom kicker (if possible) (Going to stay with topping lift for one more season, working on vang)
- Think about running outhaul and downhaul lines aft (On hold until next year)
- Mast wedge system
- Think about wooden whisker pole
- Three coats of varnish to aft hatch, sliding companionway hatch and hatch boards
- Paint cabin settees
- Light sand and two coats of bottom paint (Heavier sand for the keel)
- Create new tiller or upgrade varnish on old one (Sticking with current tiller for next season)
- Touch up paint on anchor locker door repair
- Add brass solid back to cockpit coamings and lengthen section for aft cleat (protect oar instead & wait a bit on toe rail brass)
- Trim cockpit sole to relieve binding (A bit more still needed)
- Alter bilge pump strainer location to maximize bilge water removed
- Rework bilge pump exit hose to ease installation (Completed, replaced with flat, roll-able irrigation hose)
- Work on anchor locker door to improve opening (Completed for now - much better but still might need work)
- Look for alternative locking method for aft hatch
- Fix oar and oarlock system (Mostly completed - Oar lock and keepers work great but oar no longer fits in storage bracket - still need to work that out)
- Fix minor rudder tube leak
- Sew jib bag, mainsail cover and cockpit cover side curtains
- Design & build cabin cushions
- Rubber / Canvas mast boot
- Add toe rail tie-down hooks for cockpit cover
- Find suitable small dinghy
- Assemble cookware, bedding etc and create storage in forward hold
- Get oil anchor lamp (Completed)
- Cabin lamps
- Fabricate stove mount
- Implement alternative toilet system
- Fuel holders and storage location
- Finish & print custom logbook
- Create custom chart book
- Assemble boat tool kit
- Fix & upgrade mooring chock pin and pin retention system
- Think about mid-cleats
- Decide on whether to put name on transom
- Hull ID number and registration, yuck

0 comments:
Post a Comment